- Dr. Pascal Rheinert
- Contentserv
- 0 Comments
Achieved goals
- Introduction of Contentserv-PIM as the central product database
- Setup of Contentserv-PIM as a central application with worldwide use
- Connection to SAP as well as links to the website and trading partners
- Concept connection PIM to spare parts eShop based on Magento
![](https://www.conigon.com/wp-content/uploads/2020/08/cs_vb_gbg_pim_faucets.png)
![](https://www.conigon.com/wp-content/uploads/2020/08/cs_vb_gbg_pim_toilets.png)
Period
– Oktober 2019 til mid 2017
– from mid-2017: further development & intensive training
– from mid-2017: further development & intensive training